Implementation of LED Low Location Light

7.05.2023

Signwell Oy has been contracted by Rauma Marine Constructions Oy to supply and realize the LED Low Location Light for the new building of Tallinks new ferrie, MyStar. The installation of the LED LLL has been done thoroughly by the installation team to meet the maritime industries strictest regulations (IMO RESOLUTION A.752(18) and ISO 15370) and in that way create an effective escape route system on board the ship.

The apprpoach and scope of the project

The scope for Tallink MyStar included the following:

Starting points for the LLL project with regard to laws and regulations:

MS Tallink MySTAR ferry is a Ro-Pax passenger vessel operated by Tallink-Silja Line, an Estonia-based company. The ship was built by Rauma Marine Constructions with the beginning in the spring of 2020 and finished in the end of 2022. MyStar is a LNG driven modern Ro-Pax passenger vessel with a length of 212,4 m.

Read more about our LED Low location Light systems here:

PHOTOLUMINESCENT LLL SYSTEM

LED LLL SYSTEM

Read also

Subscribe to our newsletter

  • This field is for validation purposes and should be left unchanged.